This high profile site is located on the prestigious waterfront redevelopment, Jacksons Landing. The project, spanning over 4000m2, was carried out over two years and involved stripping all metal and facade coatings and renewing, along with the replacement of 600m of custom balustrading. Further, the works required the design and implementation of a height access […]

Balcony Addition and Remedial Rectification in Kirribilli, Sydney

Kirribilli balcony addition completed on Sydney harbour

Project The overall project involved Remedial Rectification, Balcony Additions and Upgrade Works to an existing Unit Block consisting of 18 units of brick construction with no balconies. Working Group Owners Corporation Working Group Architect – Ben Johnson MHDP Project Manager – Matt Gralton EY Engineers – Simon Walters, Dennis Bunt DBCE Builder – Clint Bowen […]

129 Bower Street Manly

Boorambil - 129 Bower Street Manly - Featured Image

Overlooking Manly Beach, Borrambil is one of Manly’s oldest buildings. It required something special when Fluid was asked by the owners to help them with the replacement of sewer and stormwater services. As with all builds from its era, the services for the building were all lodged inside heritage listed brickwork. Work of this kind […]

13 Victoria Parade Manly

Victoria Pd - 13 Victoria Parade

Fluid where asked to bring one of the oldest and most beautiful buildings in Manly back to its former glory. The beautiful old red brick building underwent a complete face lift, which included repointing of the brickwork, painting of the ornate timber windows & eaves. The transformation was completed with the re-tiling of the shop […]

Manly Sea Life Sanctuary – Oceanworld

Manly Sea Life Sanctuary - Oceanworld - 3

Fluid carried out over 8000 litres of concrete repair to the Sedimentary Tank. During the process, Fluid got really innovative with the works. Blasting, forming and repair works were carried out at night, using special techniques developed for the project – all the while ensuring the marine life still got a good night sleep! What […]

6B Mosman Street Mosman

6B Work in Progress - 6B Mosman Street Mosman

Fluid are used to transforming the facades of unit blocks, but giving a car park a face-lift is something a bit different. This apartment car park in Mosman is currently being improved with renewed waterproofing and an asphalt topping to the carpark surface. A new frameless glass handrail around the perimeter of the carpark and […]

20-22 Birkley Road

20-22 Birkley Road - 1

As part of the ongoing rectification of this beautiful building. Fluid completely stripped and rectified the “two towers” of their mosaic tiles and balconies. We straightened the lines of the towers and came up with beautiful details that were functional and efficient. The owners were so thrilled that we also completed their membrane roof that […]

75 Evans Street Freshwater

75 Evans Street Freshwater - 6

Taking an existing brick apartment block which required concrete and brickwork remediation. Turning this beach side residence into a modern, functional and low maintenance property. What We Did Remedial Works Residential Works Façade Replacement Other Projects 88 Lagoon Street Narrabeen Nearly 20 tonne of pebbles and over 100 tonne of… VIEW PROJECT 129 Bower Street […]

67 Evans Street Freshwater

67 Evans Street Freshwater - 1

Major works to include the addition of a unit below the existing block of units. Utilising extensive membrane coating systems to protect against the neighbouring water of Freshwater Beach. The extensive works included full render system, new windows & doors, telecom & data systems, security system application, full internal refurbishment of units & new roof. […]

63 Crown Road

63 Crown Road

Facing Manly Wharf, ” Manooga” is one of Manly’s iconic buildings. The scope was to bring the 1960’s precast building to a modern and practical finish, adding value and aesthetics. A project like this involves stripping back a building to bare bones and starting again with a new custom design and remedial building practices. Fluid […]